Friday, 27 March 2015

The Bane of Renewables

I live in a region of N.America which is blessed with a wealth of human essentials.  We have some of the most productive farmland in Canada; flat land easy to cultivate, abundant sunshine, moderate temperature, fresh water surrounds us and it rains just the right amount.
The one thing that I do not think we have in abundance is high winds or persistent winds.  Nor do we have, at our latitude, high solar radiance.  It is not what anyone would call the ideal area to install a wind farm or a solar farm and yet we are surrounded by one of this continents largest wind farms and solar installations are everywhere.  Why has this happened?
The first obvious answer is money!  Our Liberal provincial government has advertised to offshore manufacturers that they will promise a subsidy of public funds to guarantee the profits of their installations.  No matter how much power is produced, they are sure of earning a measured 20 year return on their investment.
This lucrative deal must have been negotiated in the dead of night because any sensible engineering analysis on the part of the government would have shown the folly of these contracts.  It was an outright give-away of tax money for the political expedience of buying a "green" reputation.

The statistics for wind energy power production are well known.  The siting must have an average of at least 27% wind of 20 km per hour per annum at the height of the turbine hub.  The site should be in an area not economically advantageous for any other industry, thus low-cost, and the visual and aural impact of the installed capacity should not encourage public dissent.  Average cost to the consumer must be in line with the other methods of electrical production and still provide the industry with a reasonable return.  When any of the standards are not realized, any deficiency must of necessity be replaced by a competing benefit.

California wind-farm in the Mojave desert near Tehachapi
The above image gives a long view of such a siting.  It is on the lee-side of the Tehachapi Pass, on the empty scrubland of the desert about 70 miles north of Los Angeles.  Only two other sites in California are similarly advantageous and both have been maxed out.  The state government did in the eighties what Ontario has recently initiated.  It gave power companies and investors the lucrative potential of guaranteed return-on-investment.  However, the stipulation was narrowed correctly. There should be little or no public dissent or impact on the surroundings.  One further designation by the state was that the power would be usable to the grid.  In other words, the power produced would add in some significant way to the energy needs of the local area.  Thus, the only wind-farms in California are all within 100 km of the three major population centres, LA, San Diego and San Francisco, and yet are hardly visible to 99.9% of the population.

It was not done this way in Ontario.  The government chose to award, without public input, the guarantee of profitability as well as the legal framework to stay in business, regardless of the economic benefit.  To get around the problem of siting choices in my area of S.W. Ontario, which did not adhere to the public interest restriction, the turbine installers found a ready answer.  Offer private land owners a share of the profit, long-term, and remove the right of any municipality or public entity the right of dissent.  This was duly initiated by the provincial government and inscribed in the binding contracts.
The result of course has been predictable.  Public outcry, legal challenges, fiscal malfeasance, and a region of the province visually scarred. 
Neighbours have been set against each other, one benefits while the other is negatively impacted.  The produced power is not usable at opportune times and must be sold at a loss.  The transmission corridor is inadequate for the peak loads and must be augmented at high cost.  The power is produced far from major centres and transmission losses are excessive.  The end-of-life costs of removal will have to be borne by the public.  
On and on the negatives add up while the positive impact of the power produced has turned out to be insignificant.  We produce 65% of the regional baseline through nuclear energy, the next 25% is the giant hydro projects at Niagara and the remainder is gas fired thermal with peaking added using gas turbines and purchased transfer power.  Only two coal fired thermal plants remain in the mix and will soon be mothballed.  Ontario could proudly proclaim to be a clean energy producer before wind and solar were even envisioned, but now they can claim a minuscule 1.7% "clean, green renewable" designation to please some environmentalists.
The Korean company that produces the turbines has benefitted greatly, while one local community has received only a short-term plant to produce parts.  As few as 50 permanent jobs for maintenance techs have been generated long-term  and a few years of construction contracts will be completed in the near term.  The provincial power distributer has to find a buyer for the excess power at cost or below.  The 200 ton concrete foundations of each steel tower will be leaching into the surrounding farmland for generations.  Private aviation safety during low visibility is being compromised.  The most comprehensive avian migratory flyway exists in the same corridor as the turbines.  This winter, ice accumulations on the turbine blades has produced missiles that have been hurdled half a kilometre.

In the next few weeks I am going to try to find out from the various concerns what the actual electrical production has been during the preceding year and what the economic benefit has been to Ontario Power Generation.  I have very little hope of receiving a true answer.

It is now October 26, 2017.  I am adding an addendum to this post.  The North Kent Wind Project, the next set of 100 turbines, was started about a year ago and the process of constructing foundations for the wind turbines has begun.  In this north county area a number of landowners have experienced contamination of their water wells due to the pile driving for the foundations.  The vibrations of pile driving have caused black sediment from layers below to enter water supplies.  13 farms have been impacted.  The construction goes on, protesters have been ordered to stand down or be fined and arrested. The wind company has more lawyers so the farmers can do nothing.  The gov. of Ontario is on the side of the installers and the fight goes on.

Added June 17,2018---The Liberal gov't that is referenced above has now been so roundly defeated that they are no longer a legitimate party.  The new Progressive Conservative majority gov't will try to undo the wind contracts and start over.  No doubt it will cost taxpayers billions to get out of these contracts.  The turbines will remain.  Maybe to be auctioned to the highest bidder and stay to produce a few more years of power before the maintenance becomes costlier than the earnings.  Stay tuned.




No comments:

Post a Comment